Thursday, January 13, 2011
In between our trip to CA for Thanksgiving and our trip to UT for Christmas (only two weeks) we were busy updating our kitchen!! We worked like crazy to get it all done before we left and we pretty much pulled it off. Here are a few pictures to document the transformation.

Projects included; lowering the unusually high island, taking off blue and white tile backsplash, ripping out drywall behind backsplash, hanging new drywall for backsplash, removing white countertops in preparation for new granite, removing bar behind sink to level the counter surface, rebuilding wall behind sink, lowering pipes behind new wall, installing bead board onto new wall and sides of island, laying tile backsplash, painting island and new wall, installing new faucet, and finishing trim....whew! I think that just about covers it.

We are so happy with the way it turned out. It was A LOT of work (Jordan did everything but lay the granite, he's quite the handyman!). It was a very crazy two weeks with lots of late nights, and we have a few finishing touches to make, but we did it! I'm so proud of Jordan and so happy to have a new kitchen!








